Commissioned development · MVP
Forecast demand and support supply-chain decisions
Future product demand needed to inform planning in a supply chain with an automated warehouse.
Project details →From the research question through Proof of Concept (PoC) and prototyping to an MVP: these projects show how IAP develops methods, tests them on real data and turns them into applications.
Commissioned development · MVP
Future product demand needed to inform planning in a supply chain with an automated warehouse.
Project details →
Commissioned development · decision support
Market information needed to move beyond data presentation and provide a basis for daily trading decisions.
Project details →
Commissioned development · delivered solution
Train operating data was to provide indications of conditions relevant to maintenance. Changes caused by varying loads and operating conditions needed to be distinguished from possible component faults.
Project details →
Commissioned prototype · related collaborative research
Interpreting flow-cytometry data requires expertise. Rare entities, different measurement conditions and limited training data complicate automated classification.
Project details →
Project work · method evaluation
Viessmann needed an assessment of sales-forecasting methods for strategic planning. The task was to determine which methods suited that planning problem.
Project details →
Collaborative project · Proof of Concept (PoC)
Company fundamentals were to support systematic stock selection that people could inspect.
Project details →
Project work · implementation
IAP implemented AI-assisted data processing and configure-price-quote models (CPQ) for Siemens Healthineers. CPQ connects product configuration, pricing and quotation generation.
Project details →
Hospital prototype · collaborative research
The quality of blood and bone-marrow samples affects interpretation. Dilution and complex cell populations need to be considered in the analysis.
Project details →
Research project · 2024 study
Different inflammatory conditions can cause similar symptoms. The study examines what additional support can be obtained from blood parameters.
Project details →
Historical engineering work
IAP was founded as an engineering firm in 2000. Before its current focus on AI, its services included industrial plant planning.
Project details →
Feasibility assessment · scoping
Which marketing and merchandise-planning tasks are suitable for targeted use of AI? The Body Shop needed an assessment of potential applications and the prerequisites for implementing them.
Project details →Proof of Concept (PoC) using real data
Initial review of a property listing requires information from text, images and other data sources. The aim was to automate recurring preparatory work and combine the findings in an overview for assessment.
Project details →
Commissioned development · MVP
Orders need to be grouped into suitable picking batches. Estimating pallet requirements also supports dispatch planning. Both tasks must account for the relevant logistical constraints.
Project details →
Data analysis · further method development
How does use of a company website relate to later project enquiries? The analysis for LANCOM Systems examined browsing behaviour alongside associated project information.
Project details →In a free, non-binding 20-minute introductory discussion, we clarify your objective, starting point and a useful next step.